Data Center
- Green, sustainable, highly efficient DC
- Low PUE - 1.10 to 1.20 - with hydro cooling
- High future demand for AI data centers
- First DC dedicated to AI in the SE, Adriatic region and Central Europe

Green DataIstria · Tupljak · Croatia
A 40 MW AI-ready data center, expandable to 60+ MW - a key player in digital transformation and AI services in South Europe.
Ecologically sustainable and emission-neutral, following accepted best practices and regulations.
Supports various IT loads targeted at AI, high-performance computing, cloud services and enterprise workloads.
Certified to accepted worldwide IT security and operational standards.

0 MW
Power load in step 1
0+ MW
Expansion in step 2
0
Floors · 23 m building height
0
Buildings · separate electro-technical facility

| Location | Temp °C | Temp °F | Rain mm | Rain inch |
|---|---|---|---|---|
| London | 10.8 | 51.4 | 690 | 27.2 |
| Madrid | 14.5 | 58.0 | 415 | 16.3 |
| Frankfurt | 10.7 | 51.3 | 727 | 28.6 |
| Paris | 11.7 | 53.0 | 720 | 28.3 |
| Istria | 14.7 | 58.5 | 1008 | 39.7 |



3
Floors per building
6
Data rooms in total
10 MW
Design load per data room
Capable of supporting a mix of various IT loads - from enterprise workloads to the densest AI GPU clusters.
~25 kW · max 60 kW / rack
~12 kW · max 20 kW / rack
~8 kW · max 12 kW / rack






Sufficient energy and cooling capabilities - unique in this part of Europe.
Low PUE, high efficiency - a green, sustainable data center.
Empowers the local workforce and suppliers in new advanced technologies.
Provides new advanced services in all segments of the economy.
6.08 MW
Contracted grid power
Secured power contract on site today
40 MW
Phase one design load
Expandable to 60+ MW in phase two
1.10–1.20
Design PUE
Water-cooled infrastructure, passive hydro and air cooling
10–13k m³
Rainwater storage
On-site storage supporting cooling and hydrogen production
Done
Land, infrastructure, fibre network, assessments and feasibility study. Support of regional and local municipality. 6.08 MW power contract, initial team, project advisor and framework. Tender documents for global design.
Done
Master plan for a 40 MW data center in phase one, with the possibility of an upgrade to 60+ MW within the next 10 years.
31.10.2026
Construction permit. Team setup - CEO, CTO, CFO. International sales team and start of selling services.
2027–2028
Building phase one of the project - 40 MW. Deadline 31.12.2028.
2029
Adriatic Data Center in operation, together with the partner / investor in the project.